Your taskChoose the scope that matches the work you need.
Why it mattersThe scope sets the output, capacity, review responsibilities and what is excluded.
What happens nextAdd the selected scope to your quote request, enter your details, then review it before sending.
The work and the result
A useful capability is difficult to operate without installation ownership, configuration and a rollback path.
A recorded installation with configuration revision, health check and owner handover.
- Verify prerequisites
- Install and configure the package
- Check health and record rollback steps
Who it serves
- employer
- owner business
- Technical owner
- Operations lead
What you receive
- Installation record
- Configuration snapshot
- Health-check and rollback notes
Inputs needed
- Approved capability package
- Supported target environment
- Access and rollback owner
How the result is accepted
- Health checks pass in the named environment
- Owner can identify the installed revision and rollback procedure
Installation and ongoing responsibilities
- Named buyer environment
- Owner supplies hosting and permission changes
- P05 manages and P06 optimises a recorded installation
- Buyer-approved scope and permitted source evidence
- Named organisation context and accountable owner
Boundaries and dependencies
- No package is represented as available until its prerequisites are verified
- Hosting charges are separate
Related research service ↗
Optional additions
- Additional integration: One additional documented source or destination beyond the parent scope
- Additional organisation configuration: One separately authorised organisation configuration
- Scoped source migration: One approved source migration with reconciliation and rollback notes
- Additional support allocation: One scheduled support hour beyond included handover
Add-ons require a compatible parent scope and cannot duplicate included work. Mention any additions you want to discuss in your enquiry.
Lifecycle options
installconfigurehand overreview
A build, installation and ongoing management may be separate scopes. Check the commitments of the option you choose.
Compare this product’s scope options
Use the table to see the differences, then choose an option above to review its complete scope.